10-EL-002: Install Communications Conduit

Customer: DZSP 21

Location: B-18001, Andersen AFB, Guam

Start: March 2010

Complete: April 2010

Scope of Work: Install 8x8x6 steel boxes at customer service office on adjacent wall across from customer service, cut 4″ holes in walls. Install two each 12x12x8 steel boxes at comm closet, cut 4″ holes in wall. Install 4″ aluminum conduit between steel boxes, approximately 280 LF. Install 2″ aluminum conduit from box at comm closet, up the wall and across the ceiling to break room box, approximately 120 LF. Raise six each LAN outlet boxes to 68″ from floor, cut, repair and paint drywall.