12-MA-013: Repaint Safety Railings on Circular Tanks and Stairs

Contractor: DZSP 21

Location: from Chapel Road to MWR Facility, Naval Base, Guam

Start: February 2012

Complete: March 2012

Scope of Work:

Provide labor, materials and equipment to repaint safety railings on circular tanks and high stairways at AHWWTP Building 1807, 1812, & 1815, Apra Harbor.

MB1807 Stairways

  1. Water blast and repaint stair steps – 32ea including railings with traffic yellow.
  2. Water blast and repaint sidewalk with non-skid 4’wide x 120″long.

MB 1815 Stairways

  1. Water blast and repaint stair steps – 32ea including railings with traffic yellow.
  2. Water blast and repaint sidewalk with non-skid 3’wide x 240’long.

MB1812 Stairways

  1. Water blast and repaint with non-skid the following stairway landings:

Landing1 = 6′ x 13′, Landing2 = 7′ x 4′, Landing 3 = 4′ x 4′.

  1. Water blast and repaint sidewalk with non skid, 19ea. 6′ x 4′.
  2. Water blast and repaint railings with traffic yellow 420’long.

MB 1818 Stairways, roof & brackets

  1. Water blast and repaint stair steps 17ea, non-skid
  2. Water blast and repaint roof sections, 9′ x 30′, 2′ x 12′, 3’x36′, 3′ x 26′ with non skid paint.
  3. Corrosion control for 65 ea railing brackets with traffic yellow paint.