Contractor: DZSP21, LLC
Location: B-4436, Naval Base, Guam
Start: March 2010
Complete: April 2010
Scope of Work: At roll up doors, install plywood cover to prevent dust and debris from entering building, open roll up door to prevent damage from falling debris. Remove and dispose two concrete overhangs using excavator, as well as remove and dispose concrete debris. Remove plywood covers. Repair damaged wall areas above roll up doors using epoxy grout. Paint repaired areas to match existing as closely as possible.