Contractor: DZSP 21
Location: B-10, MWR CDC, Naval Hospital, Guam
Start: April 2012
Complete: August 2012
Scope of Work: Check the alignment of the existing frame and if mis-align then, realign it first before starting the extension. Install 2″Ø GI pipe around the perimeter (Horizontal) of canopy frames to hold it together. All joint shall be full welded. Install Screen tarp complete with fastening rings at the sides to hold it down. Paint the new canopy frame extension same color as the existing.