Contractor: DZSP 21
Location: from Chapel Road to MWR Facility, Naval Base, Guam
Start: February 2012
Complete: March 2012
Scope of Work:
Provide labor, materials and equipment to repaint safety railings on circular tanks and high stairways at AHWWTP Building 1807, 1812, & 1815, Apra Harbor.
MB1807 Stairways
- Water blast and repaint stair steps – 32ea including railings with traffic yellow.
- Water blast and repaint sidewalk with non-skid 4’wide x 120″long.
MB 1815 Stairways
- Water blast and repaint stair steps – 32ea including railings with traffic yellow.
- Water blast and repaint sidewalk with non-skid 3’wide x 240’long.
MB1812 Stairways
- Water blast and repaint with non-skid the following stairway landings:
Landing1 = 6′ x 13′, Landing2 = 7′ x 4′, Landing 3 = 4′ x 4′.
- Water blast and repaint sidewalk with non skid, 19ea. 6′ x 4′.
- Water blast and repaint railings with traffic yellow 420’long.
MB 1818 Stairways, roof & brackets
- Water blast and repaint stair steps 17ea, non-skid
- Water blast and repaint roof sections, 9′ x 30′, 2′ x 12′, 3’x36′, 3′ x 26′ with non skid paint.
- Corrosion control for 65 ea railing brackets with traffic yellow paint.