Customer: Atkins Kroll, Inc.
Location: Tamuning, Guam
Start: September 2012
Complete: April 2013
Scope of Work: Remove and demolish existing steel column & mezzanine system, existing gypsum boards, doors, windows, handrails, kitchenette, toilet fixtures, floor co box, metal sliding, existing carpet floors, ceiling tiles, ventilator and shower fixture. In addition, site, grading & utility, asphalt paving, percolation trench, waterline, and renovation was completed.
Asphalt Paving:
Perlocation Trench:
Waterline:
Wall Installation:
Carpet:
Floor:
Interior Painting:
Door:
Restroom:
Furniture:
Counter:
Handrail:
Finishing:
Exterior Paint:
Louver:
Palette Storage & Pump Room:
O.F.C.I. Prefab Office:
Canopy:
Stairs: