Contractor: DZSP21
Location: Route 1, South Bound, Marine Drive, Guam
Start: January 2013
Complete: January 2013
Scope of Work: Provide and install a picture type / flag frame 4’ x 8’ to be installed at the landing wall above the passage way. The flag should have a margin of 4.25” all around. The frame can be mechanically lower up and down. Restore only portions affected by the installation of the frame.