13-DE-005: Demolition and Remediation of Various Airport Facilities Phase 1

Customer: A. B. Won Pat International Airport Authority, Guam

Location: A. B. Won Pat International Airport Authority, Guam

Start: September, 2013

Complete: Done

Scope of Work:

Demolition Works

a.         Mark#1 – Advance Underseas Weapons Shop
           Removal of Hoist Rails & Eqpt
           Removal of Electrical Component
           Floors – Concrete Slab
           Asphalt Conc pavement
           Walls – Concrete Column & Walls (15%opening)
           Partition – Concrete (15% opening)
           Roofing – Tin Roofing & Steel Frames
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
           Disposal and Hauling out – tins and metals
 

b.        Mark#2 – Advance Underseas Weapons Storage
           Building
           Removal of Electrical Component
           Floors – Concrete Slab
           Column – Concrete
           Walls – CMU
           Roof – Concrete Slab
           Ramp
           Column – Concrete
           Ramp – Concrete Slab
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

c.         Mark#3 – Battery Shop
           Removal of Electrical Component
           Floors – Concrete Slab
           Column – Concrete
           Walls – CMU
           Roof – Concrete Slab
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

d.        Mark#4 – Flammable Storage
           Removal of Electrical Component
           Floors – Concrete Slab
           Walls – CMU
           Partitions – CMU
           Roof – Concrete Slab
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

e.         Mark#5 – Administrative Building
           Removal of Electrical Component
           Floors – Concrete Slab
           Walls – CMU
           Partition-CMU
           Roof – Concrete Slab
           Chainlink Fence, 8’high w/ barb wire
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

f.         Mark#6 – Flammable Storage Building
           Removal of Electrical Component
           Floors – Concrete Slab
           Walls – CMU
           Roof – Concrete Slab
           Concrete pavement restoration
           Disposal and Hauling out – conc & Masonry
 

g.        Mark#7 – Ready Magazine
           Removal of Electrical Component
           Floors – Concrete Slab
           Walls – CMU
           Partition-CMU
           Roof – Concrete Slab
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

h.        Mark#8 – Lox Storage
           Floors – Concrete Slab
           Column & Beams – Steel
           Steel post & Purlins
           Walls – CMU
           Roof – Tin
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
           Disposal and Hauling out – tins and metals
 

i.         Mark#9 – Storage Building
           Floors – Concrete Slab
           Walls – CMU
           Roof – Concrete Slab
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

j.         Mark#10 – Aircraft Rinse Facility
           Removal of Electrical Component
           Curbs
           Demo Stru
           Backfill
           Conc Restoration
           Removal of guy wires and rinse eqpt.
           Removal pf pump assy & piping
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
           Disposal and Hauling out – pipes and metals
 

k.        Mark#11 – Concrete Pads
           Demo pads
           Asphalt concrete pavement
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

l.         Mark#12 – GPD Bldg. 1306
           Removal of Electrical Component
           Flooring Demo
           Column
           CMU Wall-85% close
           Roof – Concrete Slab
           Backfill
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

m.        Mark#13 – GPD Bldg. 1300
           Removal of Electrical Component
           Flooring Demo
           Column
           CMU Wall-85% close
           Roof – Concrete Slab
           Backfill
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

n.        Mark#14 – GPD Bldg. 1301
           Removal of Electrical Component
           Flooring Demo
           Column
           CMU Wall-85% close
           Roof – Concrete Slab
           Backfill
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

o.        GPD CONCRETE WALLWAY CANOPY
           Removal of Electrical Component
           Flooring Demo
           Column
           Beam
           Roof – Concrete Slab
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – conc & Masonry
 

p.        GPD PARKING AREA
           Asphalt concrete pavement
           Walk way – concrete
           Curb
           Top soil 6″
           Hydro-seeding
           Disposal and Hauling out – concrete & Masonry

Ground Breaking:

Building 1300, 1301, 1306 – Old GPD Department

Crushing the Construction Debris

Asphalt Pavement

7 Slabs