Customer: DZSP21
Location: B-3190, Naval Base, Guam
Start: June 2011
Complete: July 2011
Scope of Work: Transport personnel lift to jobsite, Remove and dispose existing PA Speakers, wiring, and pipe pole. Install new 2 inch pipe pole, 10 ft. high, welded to bracket and bolted to roof eave. Install to each waterproof outdoor PA horn speakers to pipe pole. Install new speaker, wiring to PA amplifier inside Building 3190, approximately 20 LF each.