11-BU-010: Replace Walkway Bridge Deck

Contractor: DZSP21

Location: B-121, NCTS, Guam

Start: May 2011

Complete: June 2011

Scope of Work: Remove and dispose existing wood decking from walkway bridge, approximately 80 SF. Install new steel walkway bridge deck using ¼” galvanized steel checker plate bolted to structure, approximately 80 SF. Pressure wash concrete walkway and steps, approximately 80 SF. Apply two (2) coats non-skid paint to steel deck approximately 80 SF. Apply two (2) coats non-skid paint to concrete walkway and steps, approximately 80 SF.