11-BU-009: Install Guard Rails in K-Wing Loading Dock

Contractor: DZSP 21

Location: B-1, Naval Hospital, Guam

Start: December 2011

Complete: January 2012

Scope of Work: Supply, fabrication and installation of new removable guard rail using 1 1/2” dia. GI Pipe, 46’ Long  x  4’ High. Coring and chipping off the existing platform slab to accept 2” dia. pipe sleeve installation that will hold the removable railing installation (approx. 12 locations). Painting of new railing installation. Slab retouching due to pipe sleeve installation.