09-EL-001: Replace Sump Pumps

Customer: DZSP 21

Location: B-2118, DDGM, Guam

Start: August 2009

Complete: March 2010

Scope of Work: Procure and air freight two each Goulds sump pumps, 10 HP, 200V, 3 phase, 4 in. discharge, with float switches. Ensure electrical service to sump pumps is denergized, apply lock out/tag out procedures. Install two each new sump pumps and connect to existing piping. Remove two each 4 in. gate valves and spools. Install two each new 6 in. check valves and spools. Install new float switches, 2 ea. per sump pump. Connect electrical cables to power source, energize pumps, and adjust float switches.