Contractor: DZSP 21
Location: B-1, Naval Hospital, Guam
Start: December 2011
Complete: January 2012
Scope of Work: Supply, fabrication and installation of new removable guard rail using 1 1/2” dia. GI Pipe, 46’ Long x 4’ High. Coring and chipping off the existing platform slab to accept 2” dia. pipe sleeve installation that will hold the removable railing installation (approx. 12 locations). Painting of new railing installation. Slab retouching due to pipe sleeve installation.