12-ME-021: Repair Dock Levelers Deficiencies

Customer: DZSP21

Location: NEX B-258, Naval Base, Guam

Start: July 2012

Complete: September 2012

Scope of Work:

  1. Dock Leveler#1
    Corrosion control for the entire structure.
    Clean out debris and painting (dock leveler interior and exterior).
     
  2. Dock Leveler#2
    Replace the roll-up door and motor.
    Clean out debris and painting (dock leveler interior and exterior).
     
  3. Dock Leveler#3
    Clean out debris and painting (dock leveler interior & exterior).
     
  4. Dock Leveler#7
    Install safety disconnect breaker with metal box.
     
  5. Dock Leveler#8
    Clean out debris and painting (interior and exterior).
     
  6. Dock Leveler#9
    Repair concrete deck repair expose.
    Repair bent angle bar
    Clean out debris and painting (interior and exterior).
     
  7. Dock Leveler#L006
    Repair dock ramp hinges
    Replace side sweepers
    Corrosion control for the entire structure
    Clean out debris and painting (interior and exterior).
     
  8. Dock Leveler#L007
    Corrosion control for the entire structure.
    Clean out debris and painting (interior and exterior).
     
  9. Dock Leveler#11
    Replace side sweepers
    Paint yellow striping
    Clean out debris.
     
  10. Dock Leveler#L008
    Repair of doublers plate
    Replace chain of front lip
    Replace side sweepers on both sides
    Painting yellow stripping
     
  11. Provide vinyl sticker labels 20 ea. for electrical box & switches